Revision Sulzer Turbines Type 3 Arzew
Reference data
Country: Algeria
Client: MAN Diesel & Turbo Schweiz AG
Period: 2015-2016
Scope of Work: Installation & pre-commissioning intrumention and controls
-
Disconnection of all power supplies and protection against power on
-
Disconnection/labeling of all existing cables inside VAV
-
Removing of all existing VAV cabinet
-
Installation of new cabinet
-
Connection of existing cables according new drawings
-
Pulling new cables according new cable list
-
Connecting of new cables according drawing
-
Installation of new control desk
-
Supervision of mechanical installation of new instrument rack
-
Electrical installation of new instrument rack
-
Supervision of mechanical installation of flame supervision unit
-
Electrical installation of new flame supervision unit, pulling cables
-
Supervision of mechanical installation of new flow meter
-
Electrical installation of new flow meter