Revision Sulzer Turbines Type 3 Arzew

Reference data

Country: Algeria

Client: MAN Diesel & Turbo Schweiz AG

Period: 2015-2016

Scope of Work: Installation & pre-commissioning intrumention and controls

  • Disconnection of all power supplies and protection against power on

  • Disconnection/labeling of all existing cables inside VAV

  • Removing of all existing VAV cabinet

  • Installation of new cabinet

  • Connection of existing cables according new drawings

  • Pulling new cables according new cable list

  • Connecting of new cables according drawing

  • Installation of new control desk

  • Supervision of mechanical installation of new instrument rack

  • Electrical installation of new instrument rack

  • Supervision of mechanical installation of flame supervision unit

  • Electrical installation of new flame supervision unit, pulling cables

  • Supervision of mechanical installation of new flow meter

  • Electrical installation of new flow meter

Pictures

Location