Gas Power Station Tanjung Priok (1.000 MW)

Reference data

Country: Indonisia

Client: ABB AGĀ 

Period: 2017-2018

Scope of Work: Installation Supervison Process Control System

  • Instruction of technicians
  • Supervision of work performance
  • Removal of existing cabinets Procontrol P14
  • Removal of deconic-rack
  • Progress monitoring during installation cabinets Procontrol P14
  • Implementation of a security system at general protection cabinet
  • Supervision of connecting work
  • Supervision of Maxitherm point
  • Supervision of cold commissioning
  • Application planning
  • Connection of signal bus-cable

Pictures

Location